Development
Engineering
Jay
Preston
Development Engineer
jpreston@co.volusia.fl.us
386-736-5926 (West Volusia)
386-257-6000, ext. 15926 (Daytona Beach)
386-423-3300, ext. 15926 (New Smyrna Beach)
Fax: 386-740-5148
Commercial
development
Frequently asked
questions
Obtain
floodplain designation
Land development
Subdividing or combining lots
Use
permits
Flood plain and
elevations
Development
Engineering is responsible for providing engineering
reviews and inspections for subdivisions, site
plans/stormwater management, subdivision exemption
applications, determinations of vested rights and use
permits.
Subdivision reviews
Subdivision
reviews involve review of subdivision plans at the
following stages:
-
Sketch
plan - deals with
level of development in flood plain, if any.
-
Overall
development plan -
preliminary layout of roads, lots, drainage
retention areas, etc.
-
Preliminary
plat - review of
plat and construction drawings and detailed
stormwater review.
-
Final
plat - review of final plat.
- Final
site plan reviews consist of review of
site plans for compliance with the Land
Development Code. Items reviewed are: access,
traffic circulation, sidewalk needs, legal
parcel, turn lane requirements together with
stormwater review.
- Stormwater
reviews consist of checking stormwater
calculations, grading plan, soils
compatibility with plan, water table
determination, retention area slopes,
stabilization of slopes, checking for St.
Johns permits, affect on adjacent lands, etc.
- Unrecorded
subdivision determinations involve review proposals for
compliance with exempted activities under the Land Development
Code such as lot line adjustments, lot combinations, etc.
- Use
permit reviews involve reviewing submitted
plans for compliance with County standards.
Use permits are required before doing any
type work in the right-of-way, such as
driveway connections and underground
utilities.
Inspections
- Use
permit inspections -
Utility, preliminary driveway, road/turn lane
construction, miscellaneous
- Complaint
investigations -
Obstructions in right-of-way, drainage problems
- Subdivision
improvement inspections Progressive and
final inspection of roads, underground utilities, drainage
systems, retention area
- Final
site plan inspections
Inspection of final site plan improvements,
especially stormwater and access improvements
To schedule inspections or to get permit or inspection status,
call our automated inspection system at 386-736-5928.