Healthcare Facilities CEMP Review Process

Plans must be submitted for review here:

Plans must be one single PDF document and labeled with the facility name. Example: FACILITYNAME-EPP.pdf or FACILITYNAME-CEMP.pdf

Be sure to change the Document Drop down to reflect which plan you are submitting.

Workshop Schedule

Information on Submitting CEMP

All CEMP must be uploaded with all addenda and appendixes, including the fire plan and approval letter from the fire marshal, through the portal at the top of this page. A single document is preferred.

Emergency Power Plan

On March 26, 2018 Governor Scott signed into effect Rules 58A-5.036 and 59A-4.1265. Pursuant to the Rules, all assisted living facilities and nursing homes must obtain ample resources, including a generator/alternate power source and the appropriate amount of fuel to sustain operations and maintain safe temperatures for at least 96 hours following a power outage. Both Nursing Homes and Assisted Living Facilities are required to submit their proof of compliance with the rules to the Local Emergency Management Agency for review and approval.

The Agency for Health Care (AHCA) posted an Emergency Power Plan sample format "crosswalk" to their website as a tool for Nursing Homes and Assisted Living Facilities' development of Emergency Power Plans to meet the AHCA and Department of Elder Affairs' Emergency Power rule requirements.

Here's a link to the posting on the AHCA website where the checklists are located  http://ahca.myflorida.com/MCHQ/Emergency_Activities/EPP.shtml

State Criteria

Adult Day Care Facilities (ADC) [PDF]

Ambulatory Surgical Centers (ASC) [PDF]

Assisted Living Facilities (ALF) [PDF]

Hospitals (Hosp) [PDF]

Nursing Homes (NH) [PDF]

Agency for Health Care Administration (AHCA) facility/provider locator

Need the Acrobat PDF Reader? download one for free.

Director
James A. Judge II, CEM, FPEM
jjudge@volusia.org

Daytona Beach
386-258-4088

DeLand
386-736-5980

New Smyrna Beach
386-423-3395