Skip to main content
close icon

  Volusia County offices will be closed on Dec. 25 and Jan. 1, in observance of the holidays.

   

  Coastal Floods, Severe Rip Currents, and Significant Rainfall Expected. Read More.

  

  

Search

Boat Traffic Suspended as Two Low-rise Bridges are Locked

Posted On: October 9, 2024

Volusia County has secured two Intracoastal Waterway low-rise drawbridges, Highbridge and Main Street, into the down position. Bridge operations for boat traffic are suspended until after the storm. They will resume after the bridges have been inspected and cleared for operation. 

Potential high-rise bridge closures

Volusia County enacts high-rise coastal bridge closures for vehicular traffic when determined necessary by the emergency management director in coordination with the Volusia Sheriff’s Office and local law enforcement under the following conditions:

  • Upon the arrival of winds sustained at 39 mph
  • When visible damage to the bridge or flooding of the approaches has occurred
  • To conduct damage assessments

As Hurricane Milton approaches, Volusia County officials will continue to closely monitor weather forecasts and assess potential impacts on bridge safety. Volusia County remains prepared to implement safety closures if weather conditions warrant.

We use cookies to provide and improve our services. By using our site, you consent to cookies.